Kuster Company 2900 E. 29th Street Long Beach, CA USA 90806 Telephone 562-595-0661 Fax 562-426-7897 E-Mail [email protected]
10
11
12
13
14BATTERY VOLTAGE AND USAGE Given the variety of tests and surveys that exist in the downhole environment, a definitive guideline for battery usage
15LITHIUM OXYHALIDE PRIMARY CELLS Basic Handling Note: With the exception of QTC and PC cells, every Electrochem lithium battery is equipped with an
16During low rate discharge (5-10 microamps/cm2), the lithium ions that allow the cell to operate can migrate through the passivation layer. As the r
2ATTENTION: K10 GAUGES BOTH STRAIN AND QUARTZ OF ALL SIZES: DURING ASSEMBLE/ DISASSEMBLE, WRENCHES ARE TO BE PLACED ON THE CLOSEST FLATS. NO PIP
310. Drop some oil into the transducer sub until it’s full. Never insert syringe or any other device into the transducer port more than 1/8”, as dam
49. Connect gauge through comm. box to the computer, wait for 4 (strain gauge), and 5 (quartz gauge) LED flashes on comm. box and download data to t
56. Replace o’rings on the pressure sub and lube them. 7. Check connector’s o’ring and replace if necessary. Reassembly: 1. Extend telescopic c
67. Replace o’rings and back-up rings and lubricate them Assemble in the reverse order. DISASSEMBLE/ASSEMBLE K10 QUARTZ 1.5” SOUR SERVICE GAUGE IN
7
8
9
Comments to this Manuals